Upgrading Ceilings and Doors

Upgrading Ceilings and Doors

Upgrading the plasterboard ceilings in the study, office, lobby, entrance hall, common room, 2 staircase landings, and 5 bedrooms to 60 minutes of fire protection can significantly reduce the spread of fire and smoke. This upgrade involves installing fire-resistant plasterboard that can withstand high temperatures for an extended period. Additionally, upgrading 11 doors to meet the FD30 Standard is another effective way to improve fire safety.

This standard requires doors to be able to resist fire for at least 30 minutes, providing occupants with enough time to evacuate the building safely. By taking these measures, you can ensure that your property is better equipped to handle a fire emergency, keeping you and your loved ones safe.

All products supplied by Envirograf

Door Upgrade:

Door Upgrade: Products and Specifications

To upgrade the door, we utilised the following products:

  • HWAP Primer
  • HW01 White Intumescent Coating
  • HW04/S Top Coat

The application process involved:

  • One coat of HWAP Primer at 12m2 per litre
  • Two coats of HW01 Intumescent coating at 8m2 per litre per coat
  • One coat of HW04/S Top Coat at 10m2 per litre.

This upgrade ensures a minimum 30-minute fire protection, in compliance with BS476-Part 22.

Ceilings Upgrade:

The ceiling upgrade process involved the application of two products: EP/CP Primer and EP/CP Intumescent Coating.

Specifications:

  • Apply one coat of EP/CP Primer at a rate of 12m2 per liter
  • Apply coats of EP/CP Intumescent Coating at a rate of 8m2 per liter per coat.
  • Ensure all applications provide a minimum of 30-minute fire protection, following the guidelines of BS476-Part22.