by fireandthermal | Jan 30, 2024
Sealing Compartment Walls Sealing Compartment Walls The project encompassed the ground, first and second floor ceiling voids. Our primary objective was to seal the compartment walls, which failed to extend to the floor slab or the true roof height. In addition, we...
by fireandthermal | Jan 15, 2024
Application of Fire Breaks Application of Fire Breaks Take a look at this intriguing case study that showcases the use of 21 fire breaks, along with the ECPS wrap system, to achieve a minimum of 90 minutes of fire protection at a transmitting station. The transmitting...
by fireandthermal | Jan 4, 2024
Surface Upgrade of Timber Framed and Timber Clad Building Surface Upgrade of Timber Framed and Timber Clad Building The HWAP Primer was chosen as it provides excellent adhesion to a variety of surfaces, including wood, and is designed for use with the HWO2/N Clear...
by fireandthermal | Oct 31, 2023
Fire Stopping – Compartmentation of Roof Void Fire Stopping – Compartmentation of Roof Void Compartmentation of a roof void to 60 minutes fire protection is an essential safety measure in building design and construction. The roof void, or the space...